09/11/2025
Today's shot was for installation of storm drain in a new housing development. Located within 30 feet of a major cross-country fiber optic transmission line on one end, a newly installed sanitary sewer line on the other, and new houses within a couple hundred feet meant needing to control vibration within acceptable limits and preventing flyrock. As well as coordinating with the relevant parties involved, mitigating concerns, and verifying a sound blasting plan.
Overall, I believe this turned out pretty good.
If you have a project where rock is in your way, either for mass excavation or trench, we'd love to help!